A.L. Mebane Middle School

Cafeteria Addition and Renovation | Alachua, FL

DSC_0719

Project Details

The project included the demolition of the existing cafeteria except for the concrete slab and block walls. A major addition was built, integrating the existing structure to provide what appeared to be a 100% new facility. The project included a state of the art kitchen and cafeteria and was performed on an active, occupied campus adjacent to occupied buildings.

Date Completed:
2011
Project Size:
20,000 SF
Client:
A.L. Mebane Middle School
Owner:
Alachua County Schools
Delivery Method:
Construction Management