This cafeteria addition and renovation project was constructed on an active, occupied campus and completed on time with an aggressive schedule. In addition to an aggressive schedule, the building was designed to be placed adjacent to an existing student wing. The project was completed with limited access, a high level of attention paid to occupant safety, and with minimal disruption to the students and faculty.